MegaKC

MegaKC is an ESOP company in Kansas City, Missouri, where long-term decisions directly impact employee-owners. When evaluating capital projects, the question is not only cost, but durability and predictability. That context drove the decision to install a 242-panel rooftop solar system with Artisun Solar.

The 100 kW DC system now supplies more than half of the facility’s annual electricity needs, reducing exposure to utility volatility while supporting steady operating costs. The project was enabled in part by a federal ESOP tax credit, aligning financial incentives with the company’s ownership structure.

In the first year of operation, the system generated $12,774 in electricity savings. Over its lifetime, total savings are projected to reach $572,256. Based on current output and incentives, the system reached payback in 6.7 years.

Client Testimonial

John Doe

Lorem Ipsum Company

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. 

Ryan Mills

Vice President of Operations, MegaKC

We have a fiduciary responsibility to our ESOP. With the tax credits and the $12,000 a year we will be saving in electric bills, it was a clear choice that we needed to do it. It was almost like Artisun Solar was behind the eight ball from the start because we have to make good, sound decisions for our ESOP.

Project Details
  • Location: Kansas City, MO
  • Type: Rooftop
  • Solar Panels: 242
  • System Size: 100 kW DC
  • System Output: 75 kW AC
  • Environmental Impact: Offsets 425.20 metric tons of CO₂
  • Incentives Utilized: Federal tax credit, ESOP tax credit
  • Utility Provider: Evergy
  • First Year Electricity Savings: $12,774
  • Lifetime Electricity Savings: $572,256
  • Energy Covered: 58.47%
  • Payback Period: 6.7 years
MegaKC employee-owned headquarters solar installation by Artisun Solar featuring ballasted roof mounts.

Recent projects

Cinematic aerial image of the K&J Chevrolet building and its newly installed solar array that is projected to save $15,911 in its first year.

K & J Chevrolet

K & J Chevrolet, located in Carlyle, IL, is a Chevrolet dealership and service provider with a 5-star reputation for customer service. Behind the scenes,

Read More
Aerial footprint of the 1,718 panel commercial solar array by Artisun Solar in Chandler, Oklahoma.

Central Expanded Metal

Central Expanded Metal in Chandler, Oklahoma, operates a high-demand manufacturing facility where energy usage plays a major role in day-to-day operations. To help reduce long-term

Read More
Custom Sheetmetal (CSM) 100% solar-powered manufacturing plant in Topeka KS.

Custom Sheetmetal & Roofing

Artisun Solar partnered with Custom Sheetmetal & Roofing in Topeka Kansas to install a rooftop solar system that now covers 100% of the facility’s electricity

Read More

Interested in reducing
your energy costs?

Speak with our team today!