
Technical setup for the GRO Alliance solar installation. This system converts on-site solar generation to a 321 kW (AC) output, reducing reliance on Cuba City Light and Water and lowering first-year energy costs by $33,511.

Technical setup for the GRO Alliance solar installation. This system converts on-site solar generation to a 321 kW (AC) output, reducing reliance on Cuba City Light and Water and lowering first-year energy costs by $33,511.